Building Automation Integration
What actually has to talk to what, and who owns the seam. What Division 25 coordinates →
Overview
Integrated automation: how mechanical, electrical, controls and networks are supposed to meet. Architecture, points, sequences, interfaces and documentation — the seams, not a brochure of “smart building” language.
The useful output is a package someone can build and commission against: who owns the point, who owns the sequence, and which test crosses the terminal.
Index
Building Automation Integration
What actually has to talk to what, and who owns the seam. What Division 25 coordinates →
Controls Architecture
Controllers, networks and supervisory layers as one system, not a pile of vendor drawings. BAS network architecture →
System Interfaces
Where Division 23, 26 and 27 actually meet Division 25. Division 25 vs Division 23 →
Sequences of Operation
From written sequence to something a controller can execute without inventing the missing logic. From sequence to architecture →
Points & Integration Requirements
Points lists that survive commissioning because ownership was decided before the panel was landed. Coordinating points and sequences →
Network / OT Coordination
Building networks that share a closet with IT and still have to run. BAS, OT and network →
Division 25 Documentation
Construction-ready integration maps: signal, owner, test.
What we investigate
Typical systems
Have a problem in this area? Start with the symptoms, the system, and what has already been tried.