Services

Division 25 & Building Automation

Overview

Integrated automation: how mechanical, electrical, controls and networks are supposed to meet. Architecture, points, sequences, interfaces and documentation — the seams, not a brochure of “smart building” language.

The useful output is a package someone can build and commission against: who owns the point, who owns the sequence, and which test crosses the terminal.

Controls Architecture

Controllers, networks and supervisory layers as one system, not a pile of vendor drawings. BAS network architecture →

Network / OT Coordination

Building networks that share a closet with IT and still have to run. BAS, OT and network →

Division 25 Documentation

Construction-ready integration maps: signal, owner, test.

What we investigate

  • Missing or unreliable points
  • Sequence mismatch
  • Integration failures
  • Controller communication problems
  • Unclear responsibility boundaries
  • BAS / network interface issues
  • Alarms or commands not behaving as expected
  • Third-party system integration problems

Typical systems

  • BAS and field controllers
  • Controls networks, including BACnet/IP where installed
  • Supervisory workstations
  • Metering and lighting control
  • Third-party interfaces

Have a problem in this area? Start with the symptoms, the system, and what has already been tried.

Building mechanical services that automation has to coordinate