Division 25 Coordination Package

Technical development and coordination of Division 25 requirements connecting mechanical controls, electrical systems, metering, lighting controls, network infrastructure and monitoring.

Challenge

Each trade stopped at a terminal. The building did not.

Scope

Coordination of responsibilities, interfaces, points and documentation across the trades that actually meet at Division 25.

Technical approach

Write the seams: signal, owner, test. Keep the package construction-usable.

Systems / tools

Mechanical controls, electrical metering, lighting control, network, monitoring.

Deliverables

Coordinated design package for integration requirements.