Selected Work

Engineering Project

Retail Electrical Expansion & Reconfiguration

Occupied retail/commercial space expanding while existing distribution remained in service.

Challenge

New loads had to land on infrastructure that was already serving an occupied floor.

Scope

Existing-system review, demolition coordination, branch-circuit reconfiguration, panel utilization, lighting and emergency systems, equipment power coordination and construction documentation.

Technical approach

Establish what could stay, what had to come out, and where new circuits could land without treating the panel schedule as fiction.

Systems / tools

Existing panels, reused branch circuits, lighting, emergency lighting, new equipment loads.

Deliverables

Construction documentation coordinating demolition, reuse and new loads on the existing distribution.